Hawkins Engineering TW has been working with the DASSH Joint venture on the Elizabeth Quay Pedestrian Bridge in Perth Western Australia. Hawkins Engineering has been the primary temporary works designer during the entire project. Key design elements have been; Formwork design for bridge piers and abutments which included modelling all […]
Monthly Archives: July 2015

LOCATION: Melbourne, VIC CLIENT: Theiss/Holland INFO: BR6 & BR84 bridges DESIGN: Temporary works
Eastlink Bridge

LOCATION: Lake Yurrunga, NSW CLIENT: Leighton Contractors INFO: Shoalhaven and Southern Highlands water supply DESIGN: Temporary spillway and falseworks
Tallowa Dam

LOCATION: Swan River, WA CLIENT: Leighton Contractors INFO: 397m 6 lane bridge DESIGN: Incremental launch system
Narrows Bridge, Western Australia

LOCATION: Johor River, MALAYSIA CLIENT: VSL Malaysia INFO: 1.7km expressway bridge DESIGN: Technical review of bridge launch system
Johor River Bridge

Design of launch system for steel box girder bridge.
Brighton Bypass Bridge

Design and development of casting bed for incremental launch bridge over the Molonglo River, Canberra. Part of the Majura Parkway Project for Fulton Hogan. Included the design of reinforcing steel jig and lifting frame.