Design of Temporary access, Mobile Crane and Drill Platforms
Design of formwork system and bridge erection method
Design of incremental launch bridge casting bridge for the Majura parkway project in Canberra
Design and development of Launch system for 60m Steel Box Girder bridge.
Temporary works engineers specialising in bridge construction, tempoarary access and formwork systems.
Development of construction methodologies including bridge launches, structural erection and lift studies.
Construction methods review and design and monitoring, Hawkins Engineering TW can also assist in tender review and preparation