Hawkins Engineering TW has been working with the DASSH Joint venture on the Elizabeth Quay Pedestrian Bridge in Perth Western Australia. Hawkins Engineering has been the primary temporary works designer during the entire project. Key design elements have been; Formwork design for bridge piers and abutments which included modelling all […] Elizabeth Quays in Bridge Construction
LOCATION: Melbourne, VIC CLIENT: Theiss/Holland INFO: BR6 & BR84 bridges DESIGN: Temporary works Eastlink Bridge in Bridge Construction / Temporary Works
LOCATION: Lake Yurrunga, NSW CLIENT: Leighton Contractors INFO: Shoalhaven and Southern Highlands water supply DESIGN: Temporary spillway and falseworks Tallowa Dam in Dams / Temporary Works
LOCATION: Swan River, WA CLIENT: Leighton Contractors INFO: 397m 6 lane bridge DESIGN: Incremental launch system Narrows Bridge, Western Australia in Bridge Construction / Temporary Works
LOCATION: Johor River, MALAYSIA CLIENT: VSL Malaysia INFO: 1.7km expressway bridge DESIGN: Technical review of bridge launch system Johor River Bridge in Construction Consultancy / Temporary Works
Design and development of casting bed for incremental launch bridge over the Molonglo River, Canberra. Part of the Majura Parkway Project for Fulton Hogan. Included the design of reinforcing steel jig and lifting frame. Majura Parkway Incremental launch Casting Bed in Bridge Construction