LOCATION: Windsor, NSW CLIENT: Georgiou Group INFO: Design of Incremental Launch system, including: Cast Bed, Launch Nose, Guidance System rebar jigs. Pier formwork and access system. DESIGN: Bridge Construction Methods
Bridge Construction
Hawkins Engineering TW has been working with the DASSH Joint venture on the Elizabeth Quay Pedestrian Bridge in Perth Western Australia. Hawkins Engineering has been the primary temporary works designer during the entire project. Key design elements have been; Formwork design for bridge piers and abutments which included modelling all […]
Elizabeth Quays
LOCATION: Melbourne, VIC CLIENT: Theiss/Holland INFO: BR6 & BR84 bridges DESIGN: Temporary works
Eastlink Bridge
LOCATION: Swan River, WA CLIENT: Leighton Contractors INFO: 397m 6 lane bridge DESIGN: Incremental launch system
Narrows Bridge, Western Australia
Design of launch system for steel box girder bridge.
Brighton Bypass Bridge
Design and development of casting bed for incremental launch bridge over the Molonglo River, Canberra. Part of the Majura Parkway Project for Fulton Hogan. Included the design of reinforcing steel jig and lifting frame.